MEng PROJECTS

Foundation design project

Foundation design project

Activity 0.0-Initial site condition-page-001.jpg

Activity 0.0-Initial site condition-page-001.jpg

Activity 1.0-Concrete pouring sequence-page-001.jpg

Activity 1.0-Concrete pouring sequence-page-001.jpg

Activity 2.0-Excavation of pads-page-001.jpg

Activity 2.0-Excavation of pads-page-001.jpg

Activity 3.0-Blinding concrete layer-page-001.jpg

Activity 3.0-Blinding concrete layer-page-001.jpg

Activity 4.Formwork installation-page-001.jpg

Activity 4.Formwork installation-page-001.jpg

Activity 5.0-Steel reinforcement-page-001.jpg

Activity 5.0-Steel reinforcement-page-001.jpg

Activity 6.0-Concrete placement-page-001.jpg

Activity 6.0-Concrete placement-page-001.jpg

Activity 7.0-Concrete placement to Area 2-page-001.jpg

Activity 7.0-Concrete placement to Area 2-page-001.jpg

Project |01

 

Project |01 Foundation construction project 

This project describes construction methods and technology that were used for construction of foundations for the proposed building in order of a sequence. It discusses options and choices regarding foundation types and appropriate construction methods for raft foundation with downstand pads, together with case studies.

Descriptive method statement

Descriptive method statement

Descriptive method statement outlines the stages of construction process for the cofferdam.

Descriptive method statement

Descriptive method statement

Descriptive method statement

Descriptive method statement

Descriptive method statement

Descriptive method statement

Tabulated method statement

Tabulated method statement

An approximate estimation of the construction costs, calculated for few examples that were included in the method statements. Prices were taken from Spons 2015 price book as well as from pricing of material/equipment suppliers.

Tabulated method statement

Tabulated method statement

Design method statement

Design method statement

Showing site plan and transport arrangement.

Design method statement

Design method statement

Outlining different conditions of cofferdam construction, depending on the proximity of the river or adjacent buildings.

Design method statement

Design method statement

Showing the sequence of steel sheet piling.

Design method statement

Design method statement

Delivery of materials for steel sheet piling.

Design method statement

Design method statement

Steel sheet piling method of driving.

Construction programme

Construction programme

Project |02

 

Project |02 Cofferdam construction project

Identification, analysis and selection of appropriate methods for construction of a cofferdam on the site of re-development of a four-storey office complex to be built in vacinity of a busy town centre and on the edge of the river Ouse in Lewes, East Sussex.

High rise building design

High rise building design

concept design.png

concept design.png

site plan.png

site plan.png

Elevation.png

Elevation.png

elevations.png

elevations.png

cost analysis.png

cost analysis.png

Project |03

 

Project |03 BIM individual coursework

Development of a concept design for a high-rise building in central London, with generating basic cost/income analysis. Proposal was developed according to RIBA Plan of Work 2013.

Luxury house - Exterior

Luxury house - Exterior

Interior

Interior

Interior 2

Interior 2

Interior 3

Interior 3

Navisworks

Navisworks

NavisWorks was used to produce a construction plan and programme for the building.

Project |04

 

Project |04 BIM group coursework

Carrying out a task given by the CEO of the company, utilising full capabilities of Revit. The task was to design a high-end luxury detached modern house in Shoreham-by-Sea, providing comprehensive work plan and construction documentation for development of this project.

A demonstration of Walkthrough (Revit Autodesk feature) was utilised for presentation and more effective communication with the client.

Just a sample of my work. To see more or discuss possible work >>

bottom of page